01 / 03Cables

Request for quote · Boards · Cables · Assembly · Components

Start witha conversation.

Tell us what you are building. We will set up a meeting and put an NDA in place, and only then ask for your drawings and data.

01 / 03 · The commodity

What are you building?

02 / 03 · The program

What does it call for?

Where does it need to be built?

Boards are built inThailand · Taiwan✦ · Japan✦ · China · USA✦

Cables are built inTaiwan✦ · Malaysia · Cambodia✦ · Vietnam · Laos✦ · China

Assembly is done inTaiwan✦ · USA✦

✦ One of our TAA-compliant routes · See the network

AttachmentOptional
Drop one file here, or browse Not needed to request a meeting. If your company has a standard confidentiality document, or something non-confidential that helps explain the project (a datasheet, a product photo), you can add it here. One file, up to 7 MB. Drawings and design data come later.

Do not send export-controlled technical data through this form or by email. Tell us about the program first, without the controlled details.

03 / 03 · You

Who are we meeting?Where do we reply?

Required
Required
Required

Handled confidentially. No drawings or design data are needed until an NDA is in place.

What happens next

After you send it.

The meeting

A first conversation about your program, by video or phoneWhat you are building, what it needs and where it can be built. Nothing confidential is needed for it.

The NDA

In place before any drawings or design data change handsIf your company has a standard one, attach it to the form or bring it to the meeting.

Your files

Requested after that, and shared only as far as the quote requiresThey go to the vetted partner we match to your program.

Program management

Then we run the program.

Your request goes to the people who will manage the program, not into a queue, and it is read in full before we reply.

To production

Every stage gate, from the RFQ to productionManaged with the partner factory's own engineering team.

Follow-up

Reorders and supply continuity · Quality and returns · Engineering changes · End‑of‑lifeThe same people stay on the program after it ships.

Timing

It depends on the commodity and on how complete the package isWe will tell you what to expect when we reply.

For manufacturers

This form is for customers with a program to build. If you are a manufacturer looking for representation in the U.S. market, start on the About page.

Representation